on 02-05-2009 8:15 PM
On exection of MRP, we are exepecting that Finish date/time of the dependent material's planned order should be the start date/time of the header material.
This is not observed
We are on ECC 6.0 and have Rep mfg with std routing. there are no inhouse time or schedule margin key values.
Hi,
Please check below link if this can help it.
http://help.sap.com/saphelp_scm2007/helpdata/en/c3/9e443cfb06e532e10000000a114084/content.htm
Regards,
Anil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Aditya,
Generally it would be reverse of what you are saying, the Order start of the header material would be the child material requirement date and based on its Schedule margin key defination you would get the start date of the Child material.
Regards,
Prasobh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Go to OPU5 select your order type * click on it, inside in scheduling select Adjust Date- as Adjust basis date, dept requt. to order start.
Please run the mrp with planning mode-3 deleted and recreated and check your result.
Please try and come back.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In the material master data of head part, leave the fields of GR processing time and In-house production blank, then re-run MRP again to check.
Hope can help you!
Regards
Tao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.