Former Member

Regarding PIR Reduction's from R/3 to APO

Hi - Please help me with the below issue !!

When a PIR is reduced (withdrawn) in R3 as a result of backflush goods issue, the corresponding PIR in APO does not reduce but it is fine with R3. Please let me know if any configuration settings are missing at APO level.

Any suggestions will be much helpful.

Please let me know if any further info is needed .

Thanks a lot!!

Pullaiah.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Feb 05, 2009 at 10:04 PM

    Hi,

    Do you have a strategy maintained in demand tab of location product master in APO?

    The main factors that decide consumption are the assignment mode and the check mode in location product master that come from the strategy group in MRP3 tab of ECC material master. Check your strategy group.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Venkat,

      Thanks you very much for the quick reply.

      I will check and let you know, and will post if any information required.

      Thanks,

      Pullaiah.

  • avatar image
    Former Member
    Feb 06, 2009 at 05:49 AM

    Hi Pulliah,

    Normally for MTO (Make to order) scenarios, PIR consumption will happen in APO and for MTS (Make to order) scenario, it won't happen. The same is controlled by Strategy group in MRP view data as indicated by Visu Venkat.

    Regards

    R. Senthil Mareeswaran.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Guys,

      Thanks a lot for both of u .

      Missing category group assignment in the category group of the requirement.

      Solved my problem.

      Regards,

      Pullaiah