Dear all,

we are seding our final product to outside agency for testing because of unavailabilty of test equipment, how will we can map this scenarion in SAP.

Please Guide me.

Thanx & Regards,

Harish Parab

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

hi shyamal,

I have configured system as mentioned by you. also generated inspection lot but where will i get service PR for that lot.

Thanx & regards,

Harish Parab

Former Member
0 Kudos

hi shyamal,

I have configured system as mentioned by you. also generated inspection lot but where will i get service PR for that lot.

Thanx & regards,

Harish Parab

Former Member
0 Kudos

Thanx Shyamal this will help me

Former Member
0 Kudos

Hi Harish,

I think you should configure an separate control key at SPRO> Quality Management-> Quality Planning-> Inspection Planning-> Define Control Keys for Inspection Operations. that defines,,,

which business transactions should be executed for the object that belongs to the task list operation.

Step1 Configure the control key as mentioned above.

Step2 Assign it to that particular operation that needs to be performed outside, in your Task list.

Step3 When ever you assign this task list to any of the inspection lot, system will trigger an purchase document for that particular operation that is having control key representing the operation is external.

Step4 you can treat this PO as per your requirement. i.e. the service entry sheet can be processed for it.

Step5 Complete the services entry sheet and then confirm the operation. and then UD

For further information over Services Entry sheet or any other this over it refer the links and even if you have any query pls revert.

[Link - 1|]

[Link - 2|]

Hope will be helpful to you.

Regards,

Shyamal

Former Member
0 Kudos

Dear Shyamal

I was going through this scenario discussion, I have done settings as per your guidance mentioned here.

Step1 :Configure the control key as mentioned above. = DONE

Step2 :Assign it to that particular operation that needs to be performed outside, in your Task list.= DONE

Step3 :When ever you assign this task list to any of the inspection lot, system will trigger an purchase document for that particular operation that is having control key representing the operation is external.

Now I have assigned this Task list to the inspection lot then done RR and UD but in the whole process no purchasing document triggered from operation

so can you tell me what the exact process and where to see this purchase requision

Thanks

Vinay

nitinchaudhari2
Explorer
0 Kudos

Hi Harish,

You can mention it in Inspection Description of RR screen as well as you can attach test report of that external agency report in any format through service for object.

Nitin