on 02-05-2009 1:33 AM
Hi,
Some of the cost elements are not getting settled after running the production order settlement through KO88.
Can you please help me out with this issue?
Sincerely,
Ketan
Hi,
Check the cost component structure in OKTZ and check whether u have maintained all cost element.
Regards,
Sreekanth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi!
Form this message it is reflected that some of the cost elements that you want in your settlement, are not allocated to cost component structure through t. code OKTZ. Pls maintain them, I think issue should have been resolved. Also do the same maintainance after deactivating the Cost component structure and once maintain, tick the activation mark for the same.
Thanks & Regards,
Taral Patel
Hi!
Pls check whether those required cost elements are assinged in Allocation structure or not in following path.
SPRO -> Controlling-> Cost Object Controlling -> Period End Closing -> Settlement -> Create Allocation Structure
I am sure those cost elements or assignment to cost element group might have missed out in this assignment, so the problem is coming.
Pls revert back in case of query.
Thanks & Regards,
Taral Patel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Can you give the details of error log that you ae getting while settling.
thanks
Deepa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.