cancel
Showing results for 
Search instead for 
Did you mean: 

Production order settlement

Former Member
0 Kudos

Hi,

Some of the cost elements are not getting settled after running the production order settlement through KO88.

Can you please help me out with this issue?

Sincerely,

Ketan

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check the cost component structure in OKTZ and check whether u have maintained all cost element.

Regards,

Sreekanth

Former Member
0 Kudos

Hi!

Form this message it is reflected that some of the cost elements that you want in your settlement, are not allocated to cost component structure through t. code OKTZ. Pls maintain them, I think issue should have been resolved. Also do the same maintainance after deactivating the Cost component structure and once maintain, tick the activation mark for the same.

Thanks & Regards,

Taral Patel

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi!

Pls check whether those required cost elements are assinged in Allocation structure or not in following path.

SPRO -> Controlling-> Cost Object Controlling -> Period End Closing -> Settlement -> Create Allocation Structure

I am sure those cost elements or assignment to cost element group might have missed out in this assignment, so the problem is coming.

Pls revert back in case of query.

Thanks & Regards,

Taral Patel

deepa_khatri
Active Contributor
0 Kudos

Hi,

Can you give the details of error log that you ae getting while settling.

thanks

Deepa