on 02-04-2009 10:46 AM
Hi all,
Please anybody can guide me what is the purpose of partial lot ,how we can create it and what the customization is required.
Regards,
Raj
Hi Raj,
You can go for partial lots i.e. inspection for partial quantity of the total lot when the quality supplied by the Vendor is high standard in case of GR etc., This can be done using sampling procedure & sampling scheme and assign them in the inspection plan. Please through transactions QDV1 and QDP1.
Regards,
Keerthi.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
Keerthi and Shyamal thanks for your replys
Regards,
raj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raj,
Partial lots describe a partial quantity of the product to be manufactured. If partial quantities with different attributes are present, the total quantity of a production order can be divided into partial lots. Several inspection points can refer to one partial lot. A partial lot combines inspection points under the aspect of quality. If the finished product is managed in batches, the partial lots can be assigned to individual batches. Several partial lots can be assigned to one batch.
[http://www.sap-img.com/qm010.htm]
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.