Dear PP gurus,
I have a problem in PRT avaialbility check.
I have created a material PRT , and assined availability check 2 in the material master.In Availability checking control (IMG) , for both 1&2 business transactions i assined checking rule 1(stastus check),PRT release 3 (If there is a PRT shortage, there is no release) for my order type .
And the same PRT I have created as Equipment also.
Then I have assigned my mangterial PRT in my Routing operation.I didn't maintain any stock for the PRT in the plant.
Then i have created a production order ,and then i tries to check the PRT availability, system gives me pop up meassage "all PRT's assigned to the order are avaialble".
My concern is since I have not maintained any stock for this PRT , so system has to give a message as PRT is not available.
PLease suggest me , where I am doing wrong.
Thanks & Regards
Prabhakar