schedule line confirming as 0 Qty when uploaded SO using BAPI

Former Member
0 Kudos

Hi Gurus,

Iam posting sales order from flat file using BAPI.

so the flat file is passing the schedule line date 31.01.2009

but the system is taking the current date as the delivery date that is because of the VOV8 setting.

but the issue here is that PGI and the A/c doc is also creating on 03.02.2009 date.

can I control it?

When I try to do a sale order manually, the schedule line takes the current date as default if i try to change it to date in past it is not confirming the quantity.

I removed that tick in that order type VOV8.

I dont mind if it takes the PGI date diffrent but the document date also it takes as the current date.

after that i created a SO manully and there in the schedule line for 31.01.09 confr quantity 0 and 3.02.09 confirmed the quantity

After removing the tick, I created manually a SO, and given delivery date 02.02.2009 but it is automatically taking 03.02.2009.

Please help me in this regard,

Regards,

Anbu

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Carried out backwards delivery scheduling indicates that the system is to carry out only backwards scheduling for all schedule lines in the sales document.

When changing a sales document, such as adding schedule lines or rescheduling, the system carries out delivery scheduling for all lines. In some cases, the system performs forward scheduling which may have the undesirable affect of rescheduling lines that have already been confirmed.

Marked this indicator to deactivate forward scheduling.

Note that when this indicator is set, the system may determine a material availability date that lies in the past.