on 02-03-2009 5:43 AM
Hi,
Is there any process to upload mass change of reorder point on MRP areas for materials.
Please suggest.
Thanks in advance.
Hi Pavithra,
I know this is an old thread and my answer may not be relevant to you anymore but maybe it will help others. Are you trying to do a mass change for the reorder points of the MRP Areas? If so, go to tcode SA38, then run program RMMDDIBE. Then go to create/change with Data tab. Select change MRP area and there you can change the reorder points for your MRP areas.
Regards,
Chester
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
When I am doing mass change of reorder point through MM17 tcode selecting MARC table,it will chnage at plant level and getting reflected in material master once I save changes.
But I need it at storage location level.I tried to do this through MM17 tcode selecting MARD table,which will ask for storage location data(i.e storage location level).But after I save the changes,changes are not getting reflected in Display material-MRP1 view.
Can anyone pls suggest why this is happening.
Thanks in advance.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I have another constraint.
MM17 will mass change the reorder point at plant level.
Is there any process to do mass change of reorder point for a particular MRP area level.
Please suggest.
Thanks in advance.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Entering new reorder point value and clicking on "save" will do the changes imemdiately.Is this correct.
Can we undo changes if anything wrong is done?
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Will this change of reorder point(MINBE) in MARC table in MM17 gets affected to all the other tables where this reorder point is maintained.
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Go to MM17 and select Plant data for material (table name MARC) and execute.
Next iput the material number range which are to be changed and plant and execute.
Afterwards go to select fields and select Re-order point.
Hope it helps..
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In MM17,it will ask for variant.
How do i choose a variant here
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, dont enter variant
Just select MARC/Plant Data material row and then execute
in next screen enter the material from and to , enter ur plant
again execute
after dat select the materials for which u need to change the re order point
click on select fields tab @ left side corner, then from drop down list list select re order point option , there u can change
regds,
CB
try se16 and enter table marc-plant data you will get present rol,max level,safety level for all amterials . for which you want to change go to mm17 and select table marc and change the required rol.
regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Try MASS tcode.
rgrds...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Use T-code MM17
select table MARC here.
Provided MRP view is allready maitained.
regards,
sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
105 | |
14 | |
10 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.