Manual entry of the Date of manufacturing and the SLED/BBD date in the COR6N - T -code

2002 Views

Hi Guru's,

How to maintain the Date of manufacturing and the SLED/BBD.date manually in the COR6N (T-Code) for the 101 movement type. I have maintained the Min.Rem,Shelf.life and total shelf life in the material master - Plant data/Stor.1 . During the confirmation of the process order in COR6N

the SLED is greyed out (no input possible) . I have removed the Min.rem.shelf life and the total shelf life then during the confirmation when the goods movement is selected in the COR6N both the date of manufacturing and SLED/BBD are greyed.

Please suggest how to maintain the SLED and date of manufacturing manually in the COR6N - T-code.Any Exists or BADI availble please suggest

Thank you

Best Regards,

Phani