It seems that my release strategy is getting the strategy based on the value only and not considering the cost centre, but the cost centre is also a characteristic. I didnu2019t link the cost centre with CEBAN-KOSTL, I only used values in the characteristic. The release strategy is coming up, but it is based on a value and not cost centre, I want it to consider both. Accn Ssignmnet category id aslo a characyerisctic. I check CL24N. CL30N, CL20N and everything seems OK. This for an item-wise release strategy.
Thank you.