Hi all,
Please Tell me How to create formulas For Calculating Machine Time,Setup Time, Labour time in the Work Center.
My Calculation of Finding the Product cost which is manufactured Using CNC Machine is below
CNC M/c Hr Cost - Rs 300 ie.,Rs.5 per min.
If My Product Gets Completed in 5 Min Time in the CNC M/c means then My Product cost is 5 Min X Rs.5 = Rs.25.
How to create this Formula in Work Center.Pls Guide Me.
I have Gone through the Standard Formulas Available in the SAP R3.But I Can't Understand the logic how its created.
Thanks in Advance,
M.Badrinarain.