Skip to Content
0

Using Processing Groups for Input Ready Sources

Nov 09, 2016 at 02:50 AM

90

avatar image

Hi All

I am building a planning application using DS1.6 will multiple (12) queries of which a number (8) are input ready. When grouping these in processing groups I am receiving the message that "Data sources assigned to processing groups cannot be set to input-enabled."

I cannot find reference to this limitation in any documentation on processing groups in Design Studio. Has anybody found a way around this limitation, or know how it can be circumvented?

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

3 Answers

Tammy Powlas
Nov 09, 2016 at 09:55 AM
0

Hi - I am not using planning; when I searched the notes this one came back: https://launchpad.support.sap.com/#/notes/2307439/E

Could you try applying the patch and see what happens?

Share
10 |10000 characters needed characters left characters exceeded
Poovarasan Boopalan Nov 09, 2016 at 11:03 AM
0

Hi Neil,

You cannot use planning functions on data source loaded in parallel. Where to write data back to BW the datasource must be connected through a single connection (Sequential connection), but when you use the parallel processing groups the data sources are loaded in parallel through multiple connections.

It is been given in the Design studio What's new user guide. Check page no 13 in the guide below

http://help.sap.com/businessobject/product_guides/AAD15/en/ds_15_whatsnew_en.pdf

Thanks,

Poovarasan

Share
10 |10000 characters needed characters left characters exceeded
Jomy Joy Feb 13, 2017 at 05:41 PM
0

Hi Neil,

Were you able to find a way out for doing parallel execution of planning queries ?

Thanks,

Jomy

Share
10 |10000 characters needed characters left characters exceeded