cancel
Showing results for 
Search instead for 
Did you mean: 

Transfer SLD content between SLDs in SLD 640

former_member84834
Active Participant
0 Kudos

Is it possible to transfer content between two SLD systems in SLD version 640?

1.) I have a SLD (call it sldA) that contains the ABAP and JAVA data about DEV and QA system.

2.) I have another SLD (call it sldB) that contains the ABAP and JAVA data about my Production systems.

I'm running SLD version 6.40.0 - not 700.

Is there a way to get the content of sldA into sldB and keep it syncronized? I'd like to maintain two distinct SLDs, but I'd like sldB to have information about the entire landscape. This would be a one way push from sldA to sldB. I'd like this to be an automatic process, not something I have to do manually.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Though I have not worked on such environment. Your query looks interesting...I tried to find something related.

About SLD I am sure you must be aware of "SLD Bridge Forwarding" , It exists in 700 and 6.40 as well...

Is it possible to transfer content between two SLD systems in SLD version 640?

As per the [SLD6.40 Post Installation |https://websmp102.sap-ag.de/~sapidb/011000358700001149582007E] Document I think it is possible.

You might have already checked this document, If not please check page 12.

It says you need to check gateway connections & RFCs and also need to update CIM contents.(Note 669669)

To forward data from QA& DEV to Prod - Configure the bridge between this and If you do not want to receive data from ABAP systems in your SLD, set the parameter StartRfcServer to false.( Check this [Link|http://help.sap.com/saphelp_nwpi71/helpdata/en/43/da21ba13660aa5e10000000a1553f6/frameset.htm])

I think this will make your process automatic from sldA to sldB and also you will get entire landscape information in sldB (Correct me if I am wrong)

Let us know if it was helpful....

Cheers

Answers (0)