on 01-27-2009 7:17 PM
Hi All,
I have refreshed the entire testing system from production system, now i need to run a demand plan in testing system, but i am getting different errors because of some system refresh problems.
Is there any method except basis to compare the production and testing system both from configuration and customization perspective?
Please reply ASAP.
Regards
Gajendra Sharma
Hi,
Once the system is refreshed or copied, you will need to run various consistency checks. These check are
/sapapo/om17
/SAPAPO/TS_LCM_CONS_CHECK
/SAPAPO/TS_PSTRU_CONS_CHECK
/SAPAPO/TS_LCM_REORG
These should capture the errors related to planning area and versions including CVCs for DP and SNP.
Also, you need to adjust variants since they will have data from parent system.
It would have been good if you could include the errors that you are getting.
Regards
Alhad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.