Skip to Content
0
Jun 11, 2018 at 03:10 PM

Multiple inspection for same lot,valuation and rework.

92 Views Last edit Jun 19, 2018 at 05:21 AM 2 rev

Dear Experts,

I have the following scenario in which i have 10 operations in routing and 8th operation itself is in-process inspection, until and unless it is clear with defects, the rework will continue again and again. Client doesn't want separate Rework order, but cost must be incurred

I have mapped currently and i have some queries on it,

So i have maintained inspection point in routing. As per SAP during in-process inspection, i will get an Inspection lot created for the 8th operation.

Now i do results recording for the characteristics in the Inspector name XXXXX, Defects recording done, now i want to confirm(rework) the required operation to rectify the found defects. How to map this without rework order?? Should i confirm the same operation again of the same order?? Or should i add the same operation once more in the same order and confirm that?? Little confused.

This confirmation should happen in background like automatic notification or followup action, it shouldn't be time consuming process, quick, easy and simple because the quality inspector will receive more garments next.

Once it is rectified i must valuate this inspection point that it is accepted and UD will be done. UD will be always accepted in case of In-process because I already do valuation in inspection point level. Now in CO11N, they will confirm the 8th operation indicating that in-process operation is done and then proceed further.

Kindly help me on this. I'm stuck on this issue for more than a week.

Thanks in advance.