Functionality of Project Stock

Former Member
0 Kudos

Hi Experts,

Can anybody explain the functionality of Project Stock with WBS (No use of Ntworks)?

Thanks,

Arya

Accepted Solutions (0)

Answers (3)

Answers (3)

virendra_pal
Active Contributor
0 Kudos

cannot be done as material demand is generated using networks

you can do a PR/ PO manually with account assignment category Q and try

Former Member
0 Kudos

Project Stock in simple terms can be said as the material that is specialy booked for Project only.

You can then book the cost of the material on Project.

You use project stock in complex make-to-order production if:

You want to use a work breakdown structure to monitor the costs of goods you manufactured yourself as they pass through the stages of production

It is necessary, from the inventory management or materials planning points of view, to separate the materials needed for one project from those needed for another

You want to order materials with long delivery times at an early stage in your project

You want to plan configurable materials, since MRP for configurable is only possible in individual stock.

Regards,

Nitin.

nitin_patoliya