Skip to Content
0
Jan 26, 2009 at 06:54 AM

Follow Up Material

77 Views

Greetings to PP experts,

I am facing problem regarding material confirmation on production orders. As, some times i have to confirm a material on Order which is not part of BOM. And the the method i use is MB1A, via MVT 261. Problem is that, when i refer to COOIS or Co03 to check withdrawn Qty, it does not show the material confirmed via MB1A, however MB51 shown it properly.

Second problem with the method currently being used by me is that there is no control of RESERVATION number, i.e. there is no restriction over the units of material to be confirmed.

I wanna ask that, is there any way to confirm material in way that it could be controlled and reported in order information system (COOIS). [without changing BOM]

Regards

M. Tayyab Aslam