Jun 07, 2018 at 08:56 AM

Changing the storage loaction of a component inside Planned order during MRP

212 Views

Hi,

My scenario is like this.

I have a material CABT, which comes under MRP Area "MRPKD10" in plant 1234, whose storage location is mapped to KD10.

BOM of the assembly CABT consists of materials CABP, Z01,Z02,Z03 etc. Again under CABP, we have materials CIW, Z04,Z05,Z06 etc.,

Requirements are generated for this material CABT for the MRP Area. Hence I am getting planned order for this material CABT under MRP Area "MRPKD10".

We want the materials CABP and CIW also to be planned under MRP Area "MRPKD10". Currently system is planning all the materials under CABT (CABP, Z01,Z02,Z03,

CIW, Z04,Z05,Z06) under Plant MRP area 1234. We have maintained MRP Areas settings in the material master for CABP and CIW.

As said I want only the materials CABP and CIW to be planned under MRP Area MRPKD10. Concept of issue storage location tried, but it is affecting all other materials. Hence I am not able to implement.

Requirement:

Is it possible to change the storage location of the component of the planned order of materials CABT and CABP during MRP Run? During MRP Run of the material CABT, if the field PLAF-LGORT is KD10, then the storage location of the material CABP (RESB-LGORT) has to be changed to KD10, so that the dependent requirement CABP falls under MRP Area MRPKD10. In the subsequent BOM explosion of CABT, planned order will be created for CABP under MRP Area MRPKD10.