LTP issue -order report

Hi

I have run LTP through MS01..then i goto see the stock requirment list for that particular material...

then clik the tree over view ..system displays the ..all dependent materials according to BOM..

HERE I AM GETTING PROBLEM... while observing this BOM ..some components are show the requirement qty according to BOM wise ...and other components does not show according to BOM wise...so i found this problem... why show like this requiment qty..this material used in some other finshed goods.. ststem add that requirement qty also..

example...FINISHED PRODUCT-A1, A1-qty-1 bom components c1-qty-1,c2-qty-1

FINISHEDPRODUCT-A2, A2-qty-1 bom components c1-qty-1,c3-qty-1

here c1 have bom compnents.b1-qty-1, b2-qty-1

i creare pir s for A1 10qty ...A2 -10qty...then

i have run the LTP for A1,A2 finished products..

got ms05 to see the mrplists..for A1 material

here displays the plnd oder 10 for A1 ...then click on over view tree..then click order report button...

here left side show the all A1 material reqt qty..10 and shoe lthe component reqt ..qty also

c1--10

-


b1--20

-


b2-20

c2-10

here why shows b1 qty 20 and b2 qty -20... according to bom ..b1 reqt qty 10 ...and b2 also 10

if got see the A2 material also show b1,b2 reqt qty s same...

c1--10

-


b1--20

-


b2-20

c3-10

could any body clear this problem..pls guid me

but my expected result is like this ..c1--10

-


b1--10

-


b2-10

c2-10

is it possible

regards

sesidhar

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Feb 22, 2009 at 12:20 PM

    Hi,

    Let us go through the MRP process.

    Step 1: PIR for A1 and A2 generates seperate planned orders for 10 nos each.

    Step 2: Planned order of A1 generates dependant requirement for C1. i,e, 10 nos

    Planned order of A2 generates dependant requirement for C1. i,e, 10 nos

    hence 2 dependent requirements for C1. i,e, 10 + 10.

    Step 3: System generates planed order for C1.(Based on lot size of C1, it must have combined both dependent requirements in single planned order.). Hence the Planned order Qty must be = 20 Nos

    Step 4: This planned order for C1=20 nos, creates single dependent requirement for B1 with Qty=20 nos and same for B2.

    Hence whenever you see order report for A1 or A2, it shows 20 nos as requirement for B1 or B2

    Hope this clarifies your issue.

    If you change the lot size of C1 as "EX", then order report for A1 will show B1=10 nos and B2=10 nos.

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.