Skip to Content
avatar image
Former Member

Solution Manager Charm configuration

Hi @all,

I´am using SAP Solution Manager 7.0 SP 15. Configurated all Charm Steps successfully.

The SAP Solutoin Manager - Scenario- Specific Settings - Change Management - Extended Configuration -Checks - Execute Check Report is green

I can´t open any hance cycle in solar_project_admin - System Landscape - Change Requests , Create Task List, I get the result "project is not released. hance cycle can not be created".

If i click "check", there are three errors:

Message from function module /TMWFLOW/CALC_SINGLE_TRACK: No source system

(Message no. /TMWFLOW/TRACK_N103)

No track for project DF_WART_01 with log. system A36/200

(Message no. /TMWFLOW/CM_CHECK038)

CTS projects in production systems for project DF_WART_01

(Message no. /TMWFLOW/TASKLIST190)

System change options are empty.

In my authorized Change Requests - related documents (next document). i get "there are no actions in the Worklist"

i´ve no idea where my fault is. I hope you can help me.

Please suggest.

Best Regards

Daniel

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Jan 20, 2009 at 01:30 AM

    Hi,

    Please check this note 797901. This might help you.

    Feel free to revert back.

    -=-Ragu

    Add comment
    10|10000 characters needed characters exceeded

    • "

      Now I have created a new maintenance project, I´ve configured everything, when I check it, I get two errors:

      No consolidation system found for A36-200 (project DF_SOLMAN1)

      Message no. /TMWFLOW/TRACK_N806

      No track for project DF_SOLMAN1 with log. system A36/200

      Message no. /TMWFLOW/CM_CHECK038

      "

      I noticed that this thread is pretty old already but I bumped into similar error messages and in the end it was caused by a TMS route configuration that didn't match the configuration of the logical component that was in use.

      You can pretty easily verify this through SMSY. Navigate to your logical component there, select the line of the system assignment and click on Shipment Routes button. If you get an empty screen back, then your TMS transport route configuration doesn't match your logical component configuration.

      For example, you've got DEV 100 - DEV 200 - PRD 100 for a CHARM demo landscape. If your TMS transport route configuration matches this but your logical component has DEV 100 assigned as Quality Assurance, then your configuration check for CHARM will fail because there is a mismatch.

      When your configuration is correct, so both your TMS transport route as your Logical Component (system role assignment), then you should get a transport route configuration back (visible) after clicking Shipment Routes.

  • avatar image
    Former Member
    Feb 24, 2009 at 04:47 AM

    hi,

    Check the logical component assigned in your project, DEV and QAS are assigned.

    CTS projects in production systems for project DF_WART_01

    CTS should be created for the DEV system not in QAS , PRD. This project should be transported to QAS then to PRD. I would suggest you to delete all the IMG project created as part of your Solman Charm project and create a new IMG only for DEV environment.

    Add comment
    10|10000 characters needed characters exceeded