Dear Experts,
Could you someone helps us with follow case?
One and the same product can be produced on different resources. But when is produced on Resource 1 max lot size is 4000 kg and on Resource 2 max lot size is 5000 kg. In material master we can enter only one max lot size. We want orders quantities to be limited to the max lot size.
Example:
If we have to produce 10000 kg when product is produced on Resource1 the desired result is two orders with 4000 kg and 2000 kg requirement which is not covered.
When is produced on Resource 2 the result should be two orders with 5000 kg because of max lot size for WC2 5000 kg.