MRP Issue

Former Member
0 Kudos

Dear all ,

I have one item for which manual Pur Req has been created .

In MD04 Mrp stock requirement list able to see the Pur req

But if i go for ME57 the same is not available , why i am not able to see the same ?

regards

Accepted Solutions (0)

Answers (1)

Answers (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

PR's based on some selection criteria so check it in ME57.

Or also check through ME52N or ME53N

Regards,

R.Brahmankar

dhaval_choksi3
Active Contributor
0 Kudos

Hi,

As Mr.Brahmankar say check all the search Criteria.Specially Check box for Closed Requisition should be anticked.

You can find it in ME5A also.

Regards,

Dhaval

Former Member
0 Kudos

Dear Sir ,

in ME57 chosen parameters are :

material , Plant , and ticked for 1) Partially ordered req 2) req for overall realease 3) req for item wise release .

where as the same is Visible in ME5A .

Pl guide