Selection of Production version during MRP run

Hello experts

At present I am having 2 production versions for a material code as PV01 and MV01.

By putting validity date I am restricting correct version to be picked in MRP.

Is there any other way, for example in material master where if I maintain the production version, then MRP should pick that only.

Please suggest the best way.

Regards

Pradipta Sahoo

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Posted on Jan 16, 2009 at 11:44 AM

    Dear Pradipata,

    If you are having more than one production version for a material for the same Lot size and validity

    dates,and if you have given BOM selection method as 2 in MRP4 view,then always the system picks up

    the first production version defaultly.

    If you want the system to pick up the second production version in that case means,you have to lock

    the first production in MM02 or C223.

    Check and revert back.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member R Brahmankar

      Hi Bramhankar

      For single level product its ok when product is multilevel and we have in all level multiple production versions with same lot size and validity date how system will consider the PV while MRP in each level.For this I think we are not able to assign in MD61 for each level. Without deleting or keeping inactive PV, is there any way to configure system to pick the PV in required sequence?

      Regards

      Chennakeshava Rao

  • Posted on Jan 16, 2009 at 11:49 AM

    Dear,

    Go to T-Code:MD61 and select the schedule lines, with in that mention your production version. then it will pick automatically at the time MRP run.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 16, 2009 at 11:40 AM

    Hi Pradipta Sahoo

    In Material master MRP4 view in BOM Explosion & dependent Requirements in Selection method update it as 3.Assign the two versions.

    Regards

    JayShankar.A

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 16, 2009 at 11:47 AM

    Hi,

    You can also lock the production version in C223 which ever you do not want for the MRP run.

    Hope it will be helpful.

    Regards,

    Vijay.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 16, 2009 at 12:18 PM

    Hi,

    You can choose the required version by using quata arrangement.

    Regards,

    Avinash

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 10, 2009 at 07:17 AM

    I am closing the message as I did not get a suitable reply.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.