cancel
Showing results for 
Search instead for 
Did you mean: 

Moved BPM Scenario from XI 7.0 to SAP PO 7.5

Former Member
0 Kudos

Dear Experts,

We have moved BPM scenarios from XI 7.0 to PO 7.5.

We are able to see the Integration Process Objects in ESR Part.

But I am unable to view the same in ID Part.Please help me on this.

Thanks,

Neelima

Accepted Solutions (0)

Answers (3)

Answers (3)

rasjoshi
Active Contributor
0 Kudos

Hi Neelima,

We are planning to upgrade PI 7.11 to PO 7.5(dual stack).

It will be great if you can guide me on ccBPM interface.

How do I make sure my interfaces will be still running.

Regards,

Rashmi

PavanKumar
Active Contributor
0 Kudos

Hi Neelima,

Refer the below blog it might be useful.

https://archive.sap.com/documents/docs/DOC-28803

Regards

Pavan

TomXing
Contributor
0 Kudos

Hi Neelima,

In XI 7.0, there was no BPM (nwBPM). There was only ABAP-based ccBPM.

Afaik there is no way to migrate ccBPM to nwBPM. It has to be built from scratch.

Best regards,
Tom

Former Member
0 Kudos

Dear Rom,

I am new to BPM Scenrio's.Could you please help me with some blogs.


thanks,

Neelima

Andrzej_Filusz
Contributor
0 Kudos

Hi Neelima,

When I had to create my first BPM, I was using the following documentation:

"SAP Process Orchestration" - a book from SAP-Press

BIT800 - Process Orchestration Overview (SAP training course)

Best Regards,

Andrzej