Hi, we maintained 09 active in material master. we are running bg of qa05 with parameters- initial run days empty, selected "to inspection stock at lot creation, block batch selected. my raw material next insp date in batch is shown as 08.04.18 and back ground job was running on that day- log shows no inspection lots created. please advise what could be the reason for not creating the inspection lot even after reaching next inspection date. please note our inspection interval is zero in material master. please advise where to check to resolve this issue.