Hi,
We are performing EHP7-EHP8 upgrade of ECC system. Currently system is in execution phase and SUM is not able to stop the mandatory instance and stuck in MAIN_NEWBAS/STOPSAP_FINAL phase.
Severe error(s) occurred in phase MAIN_NEWBAS/STOPSAP_FINAL!
Last error code set: Process /usr/sap/SID/Instance/exe/sapcontrol exited with 2
Upon further checking I found below error in dev_disp file from instance work directory:
Wed Jun 6 09:03:47:028 2018 *** ERROR => DpTmConvertGuiLoginToReq: bad data from terminal, more data excpected (94 < 143) [dpTerminal.c 532] *** ERROR => DpRGetLogin: DpTmConvertGuiLoginToReq failed, bad data from T44_U4143 [dpTerminal.c 599] DpRTmPrepareReq: connect request from wrong client at address 127.0.0.1(localhost.localdomain) Wed Jun 6 09:03:52:030 2018 *** ERROR => DpTmConvertGuiLoginToReq: bad data from terminal, more data excpected (94 < 143) [dpTerminal.c 532] *** ERROR => DpRGetLogin: DpTmConvertGuiLoginToReq failed, bad data from T46_U4453 [dpTerminal.c 599] DpRTmPrepareReq: connect request from wrong client at address 127.0.0.1(localhost.localdomain)
Can anyone please help me with this.
Regards,
Anuja