Skip to Content
author's profile photo Former Member
Former Member

Business Objects Infoview- Error when trying to change parameters

Hello,

I have a report that needs to be ran every Friday, however the parameters must change each time. These are the steps that i'm taking.

1. I go to the history of the report and select the reoccuring instance

2. click on Actions, then reshedule

3. Under replace, I select replace existing schedule (I get the error no matter which option I pic)

4. Click on parameters and get the error : An error has occurred:

$Proxy4

Can you help me fix it please.

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jan 15, 2009 at 02:16 AM

    Hi Terretta,

    If you are using BOE 3.0 or 3.1 then this is a known issue currently tracked as ADAPT01113079.

    The fix is targeted for FP 1.1

    Hope this helps you.

    Regards,

    Sumit Kanhe

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.