Skip to Content
author's profile photo Former Member
Former Member

Job scheduling in DB13 for DB2 systems

Hi,

I have installed ERP 6.0 SR3 with DB2 v9.1 FP5.

Please let me know what are the jobs I have to schedule in DB13 to improve the DB performance and the frequency of jobs.

Regards,

Nallasivam.D

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Jan 14, 2009 at 08:06 PM

    Read

    https://www.sdn.sap.com/irj/sdn/db6

    --> Database Administration Guide "SAP on IBM DB2 for Linux, UNIX, and Windows"

    Markus

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 16, 2009 at 01:56 PM

    You have to schedule one full backup to tape or device (recommended on daily basis)

    Reorgchk for all tables depending on your requirements otherwise once in a week

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 16, 2009 at 09:47 PM

    Hi Dullesm,

    Just like to add that you should make sure the DB2 feature automatic runstats is turned on so that your tables get the latest statistics.

    Regards,

    -Beck

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.