on 11-08-2016 10:51 AM
Hi,
I am doing Patch upgrade in ECC6.0 fro SAP_APPL 600 patch level 11 to patch level 28.
I have to generato stack.xml file for execution with SUM 1.0 SP 17.
How can i generate stack for PI_BASIS 2005_1_700 because whenever i select source PI_BASIS 2005_1_700 target automatically come at PI_BASIS 2006_1_700.
If i deselect the PI BASIS patch and generate the stack file, but PI BASIS is in stack file.
How ca n i generate for PI_BASIS 2005_1_700.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.