cancel
Showing results for 
Search instead for 
Did you mean: 

Document flow

former_member240058
Participant
0 Kudos

Hi

Iam having order bom of 10 components. I want to automatically transfer all documents attached to those materials in material master into production order.

Also all documents attched to bom componnets or header material in bom should get transfer.

Is there is any config setting?

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Mayuresh Bhurke,

You can use a Production Scheduling profile to specify that in a production order or process order

particular business transactions are carried out in parallel

generation of document link from material master on order creation

generation of document link from BOM on order creation

generation of document link from material master on order release

generation of document link from BOM on order release

Check in T Code OPKP.

Check and revert back.

Regards

Mangalraj.S

former_member240058
Participant
0 Kudos

Hi

1) Generation of document link from material master on order creation-- It is used to link document to the HEADER material are copied to the order.

What about document attached to components.

2) Generation of document link from BOM on order creation-- It is used to link DOCUMENT ITEMS in BOM to be copied to the order.

My question was how to transfer documents attached to material in material master into bom and to production order.

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Mayuresh,

Did u get the solution for the problem as i have same type of problem.Pl revert back immediately.

thanks

ravi

Edited by: ravi kumar on Feb 27, 2009 8:17 AM

Former Member
0 Kudos

please check for customisation settings as specified by mangalraj

Edited by: imran shek on Jan 14, 2009 10:40 AM