on 01-13-2009 8:19 AM
Dear SAPper,
I used PRT counter to track how much qty that the qty of FG produced with the PRT (equipment PRT).
I had create the equipment PRT and used it in routing.
production order is created.
when confirmed prod order with CO11N there is two issue
1. actual usage value in PRT details is not updated
Usage value 1,000 PCS
Actual usage value 0 PCS
Remaining usage val. 1,000 PCS
2. can i used formula when updating counter reading
fo example the confirm qty is 1000
but updated in counter is 1000/4
Is there something i miss in my configuration or master data?
Please kindly help.
best regards,
Freddy
Edited by: Freddy Halim on Jan 13, 2009 9:22 AM
hi
Check the equipment PRT master data whether measurement document is getting updated.
in equipment PRT check whether you have entered the following values
1.Usage value formula
2.Measuring point
hence this will be captured during production order creation.and will get updated while confirmation .but the measuring point you have created should be same unit of measure with the confirmation of production order
but for formula based updating i am unaware of that
regards
thyagarajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Yes the lack is from formula, after i used the formula that access the right standard value key field, it work.
The measuring document quantity is created from result of formula.
But in the order operation prt detail number of value is still not updated although i used formula in my equipment PRT.
measuring document and counter update is OK.
Is there something still missed?
Best regards,
Freddy Ha
Edited by: Freddy Halim on Jan 13, 2009 12:12 PM