Routing creation

Former Member
0 Kudos

Dear Guru's

Can any one help me in creating routing with two stages on operation.

Thanks & Regards,

Arul.

Edited by: Arul on Jan 12, 2009 2:10 PM

Accepted Solutions (0)

Answers (2)

Answers (2)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

You have to proceeds following steps:

1) CA01 - Create routing

First screen = Material on which you have to create a routing

Plant

Second screen = Usage 1 if you create routing for production purpose.

Status 4 release general

Enter

2) Now go on to application tool bar and select operation

Here you have to enter work center, control key and description

For eg. 0010 w/c 1 plant pp01 description

Second opertion 0020 w/c 2 plant pp01 description.

3) Now select the component allocation

Select the material here and click on to the new assignemnt for assign the operation seqence on to the material.

4) SAVE

Now routing is create with routing group number

Regards,

R.Brahmankar

Former Member
0 Kudos

Hi ,

Creating a Routing

Use

You use this procedure to create a completely new routing.

If a routing already exists in your system with similar data, you can copy this data into the new routing. In this case use the procedure Creating Routings by Copying

Prerequisites

The following data already exists in the system:

  • If you want to maintain the routing with history: The corresponding change master record.

  • If you want to link the routing with a revision level: The relevant revision level of the material to be produced.

Procedure

1. In the SAP menu choose Logistics ® Production ® Master data ® Routings and then Routings ® Routing (or other task list type) ® Create. Note: In the following procedure the task list type Routing is referred to, primarily in menu paths. The same paths are also valid for the other task list types (reference operation sets, rate routings and reference rate routings). If you want to maintain such an object choose the instead of Routing.

2. Enter the relevant data on the initial screen.

3. Choose Enter.

The screen that then appears depends on whether you are creating a new group or adding to an existing group.

Activity The following screen is displayed.

Create group Create Routing Header Details.Continue as in Step 5.

Add to group Create Routing Header overview.Continue as in Step 4.

4. Choose Edit ® New entries.

5. Enter the data on the Header Details screen.

6. Choose Goto ® Operation overview. The Operation Overview screen appears.

7. Create operations and sub-operations for your routing.

8. Save the routing.

SOURCE: http://help.sap.com/saphelp_erp2005/helpdata/en/7e/d412f2455911d189400000e8323c4f/frameset.htm

Post here, if you have further queries,

Regards,

Vinodh