Skip to Content
author's profile photo Former Member
Former Member

Dynamic Modification Rule (DMR) at lot creation

Hello Experts

I have a question on DMR at lot creation. I have done following test as below:

Scenario Result

1.If RR = PASS & UD = ACCEPTDMR updated and go to next OK stage (Skip)

2.If RR = FAIL & UD = REJECT DMR updated and go to next NOT OK stage (Inspection)

3.If RR = FAIL & UD = ACCEPT DMR updated and go to next NOT OK stage (Inspection)

4.If RR = PASS & UD = REJECT DMR updated and go to next OK stage (Skip)

5.If only RR = PASS (No UD) DMR updated and go to next OK stage (Skip)

6.If only RR = Fail (No UD) DMR updated and go to next OK stage (Skip)

I have defined my DMR as below:

Stage 10 Normal inspection

Stage 20 Skip

Stage 30 Normal Inspection

I am fine with the outcome of test 1-5 , I do not follow the result of step 6 , when the Results Recording (RR) is failed , the next lot should be for inspection and not SKIP INSPECTION.

This is exactly what happens in step 2 and 3 .

Hope it clarifies.Do let me know if any other input is required

Appreciate your help. Gaurav

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Jan 08, 2009 at 06:53 PM

    Gaurav,

    First create DMR rule as per your requirement and assign rule to Inspection plan header level not characteristic level, and also select "Dynamic Modification at lot level" in Inspection plan header.

    It will work, let us know if you have any Q regarding this.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Nehal Khamar

      Hello Nehal

      Appreciate your response.

      I defined the DMR exactly the saem way as you mentioned but still I am not getting the desired results.

      When Results recording is failed and no UD is made the the new inspection lot is created with "SKIP" status.

      I am expeting the inspection lot with "INSP" status.

      I hope I am expecting the right results based in DMR definition(at lot creation).

      I can send you the screen shots if you want to see the details. Pls give me your email id.

      Many thanks.

      Gaurav

  • author's profile photo Former Member
    Former Member
    Posted on Jan 27, 2010 at 10:25 AM

    ok

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      At lot creation the quality level is advanced at that time. When the lot was created that you failed, the quality level was already advanced to the SKIP stage and therefor the next lot created will be at the SKIP stage. And since no UD was made on that lot, the next lot created after that will also remain at the SKIP stage.

      You will probably have better luck doing the DMR at UD instead of at lot creation.

      Craig

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.