Dear experts,
we are having a situation in which having multiple production lines able to manufactured the same product, there is a limitation due to a specific tool required to go through that manufacturing.So if there is already an on going manufacturing order in Line 1, the same product can not be manufactured in any of the other lines, so only manufacturing orders for different products could be scheduled at the same time for the rest of the lines.
Is there any way (through capacity checks, material availability checks, other alerts, etc...) to be able to manage the capacity constraints in the different production lines due to this specific tool availability?
Thanks a lot for your support,
kind regards,
Jose.