Dear all,
We have to extend a set of (>5000) materials from One plant to other. Also the Routing Master and Inspection Plan along with MIC, Work Centers and Inspection Methods are to be extended. Is there any way to do BULK extension of the following
1. Routing (Inspection Data)
2. Inspection Plan
3. MIC
4. Work Center for Inspection Plan
5. Inspection Methods
6. Selected Sets
I hope when the Material Master is extended, QM view along with Inspectrion Types will also get extended. (Please correct me if i am wrong)
Thanks in advance an Best regards
Sam
Hi,
You can use Copy of option for copying from one plant to another plant.
Copy option can be used for Inspection method QS31, MIC(QS21), Inspection plan, Workcenter,etc..
From plant you make earlier plant code & To plant you make new plant where you have to transfer the data. So we can easily create BDC or LSMW for the copy option.
come back if you require more details
Srinivasa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can use Copy of option for copying from one plant to another plant.
Copy option can be used for Inspection method QS31, MIC(QS21), Inspection plan, Workcenter,etc..
From plant you make earlier plant code & To plant you make new plant where you have to transfer the data. So we can easily create BDC or LSMW for the copy option.
come back if you require more details
Srinivasa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sam,
Yes both Gajesh and Ravi are absolutely correct. You need to extend them through BDC is the best and rather the only option.
I have tried to map your requirement through the workbench CWBQM but is not responding to the expectation.
See to upload these data first you need to download it. Either from Tables or through their relevant list reports.
The reports that may help you to download the data are.......
1. Routing (Inspection Data)-----> CWBQM
2. Inspection Plan -
> CWBQM
3. MIC -
> QS28
4. Work Center for Inspection Plan -
> CRO5
5. Inspection Methods -
> QS38
6. Selected Sets -
> QS59
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
We used following method for Master Data Transfer:
1. Routing (Inspection Data) : BDC
2. Inspection Plan : BDC
3. MIC : Use ALE ( T Code QL21)
4. Work Center for Inspection Plan : BDC
5. Inspection Methods : Use ALE (T code : QL31)
6. Selected Sets : Manually
7. Catalog: Use ALE (T code : QL41)
We transported Material Master through ALE. Inspection Type also gets transferred along with it.
Hope this helps.
RKM.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hello,
You will have to create simple BDC, for copying all the master data as there is copying option in all the Master datas.
Please check for this as per my knowledge QM View will not get updated if you do the extension for another plant. only QM Procurement Tick will get updated .If only copy from some plant you will get the inspection types and other relevant fields mapped.
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.