Hello Everyone,
If the Eng. BOM is released with a change number effectivity date (current date), how do I assign a revision to a material with the same change number but with the plant effectivity date (future date)?.
What if different plants have different effectivity dates for the same material?. How could I revision the same material for different plants?.
is it possible with the same change number I created to release the Eng. BOM ?.
Regards,
Mohan