cancel
Showing results for 
Search instead for 
Did you mean: 

Material Availability check

Former Member
0 Kudos

Hi,

please let me know the steps in config to activate materail avilability check in Project systems.

The actual requirement is when we do a reservation through CJ20N, (movement type 281), the system shoud check the avilability of materil and give an error message if there is a shoratge.

error mesage shoud display at the point of saving a materil reservation.(networks are already released).

please kindly give a solution

Regards

Sophia

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member214674
Contributor
0 Kudos

Hi,

Maintain following in img:

1..Checking rules

2.Checking scope : Checking group and checking rule determine the checking scope. Tcode OPJJ

3.Checking control: here you assigned order type like for PS it is network type. Tcode OPJK

Then for each material checking group must be assigned on MRP detail scree.

For details refer screen shots mention above.

Rgds

Abhinay Gautam

Former Member
0 Kudos
Former Member
0 Kudos