on 01-07-2009 7:56 AM
hi experts,
While Iam attaching a material component to internal activity, only I.Activity costs is displayed on planned/actuals report and no material costs are displayed.Can anybody suggest me how to display material costs.
in addition to the hemants point , please check, cost relavancy in project .
select material- check cost rel check box....
Venaktesh.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I hope ur Project is "Valuated stock". If it is "Non-valuated" then material cost wont be added.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
1.Check material master MM03, accounting 1 tab... whether price is maintained.
2. Check Costing variant used in the network OPL1. Check the valuation strategy for material price determination.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.