Cost Estimate Itemization Assignment Issue

Former Member
0 Kudos

Hi All,

When viewing a material cost estimate itemization through CK13N with Layout "1SAP05" (Cost Components / Cost Elements(Grouped)), I noticed that not all of my cost elements are properly grouped. There is a large sum with a few cost elements that are summed as "(not assigned)". I reviewed tcode OKTZ within the section for "Assignment: Cost Component: Cost Element Interval" and ensured that the cost element from/to exists as well as the appropriate cost component.

What would be the reason for not seeing the cost component description of "Raw Materials" (for example), and not "(not assigned)"?

Thanks,

Pete

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Select particular itemizzation (which is with not assigned) and select the details button - there you will get the all the details like as below - there check the material and also check the source of that particular material (i mean, with which account it is psoted). Now, chekc whether that account is assigned or not

Item number

Item category

Item category (text)

Resource

Element (Text)

Cost element

Cost element (text)

CstElement and txt

Origin group (text)

Profit center

Plant

Material

Material type

Operation

Plant/material

Plant/material (text

Price strategy

VVR

Former Member
0 Kudos

Hi Vuppala,

Thanks for the reply. It seems that the field "Element (Text)" is "(not assigned)". Can you tell me where that would need to be assigned in order for the report to display the proper title?

Thanks,

Pete