Alternative BOM in Production Order

Hi PP Experts,

I have a small issue which is like this:

I have two Alternative BOM for Material "A".

When I create production order it displays both Alt Bom for selection.

When I select the second Alt BOM, in production order it still reads the First Alt BOM.

Please advice.

Regards

Mohan

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 06, 2009 at 07:23 AM

    Hi Mohan,

    I suggest if you have two alternate BOM for a material, you can use the production versions and assign the same for the material in Material Master MRP4 view.

    Create Production Versions 01 and 02 and assign the alt BOM 1 for the PV 01 and 02 alt bom for PV 02.

    Goto SPRO : Production -> Shop Floor Control -> Define Order type dependent paramters ( Tcode : OPL8) : Define the Production Version Slection either 1 for manual and 2 for automatic. (if you use automatic system will select the version based on the material master selection method )

    regards

    radhak mk

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 06, 2009 at 07:09 AM

    hi

    Plz check validity and lot size and usage of alternative bom .

    Edited by: surendra patil on Jan 6, 2009 8:10 AM

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Dear RadhaKrishna,

      We are not using Prod Ver because for a material there are many alt routings.

      My problem is that in the production order while selecting the BOM, i get the pop-up asking me to select the relevent BOM, then I select sat Alt 2, the system still selects Alt 1.

      I dont know why this is happening.

      Pls Help.

      Vinod

  • author's profile photo Former Member
    Former Member
    Posted on Mar 20, 2009 at 12:25 PM

    Hi,

    If you want the production order to read the second BOM, In CS02 select the other alternative and deactivate the BOM status in the QUANTS/LONG text tab..

    For the other BOm, Vice versa

    karthick

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi

      Best way of maintainig Alternatives for BOM is maintaing Production version or maintaining lot size procedure and validity period in the BOM.

      If you opt for production version , then maintain settins in the order type dependent parameters as mannual production version selection.

      Regards

      Prabhakar

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.