12-31-2008 4:57 AM
Hi SDNers,
If you look into the Tcode MD01 MRP Run.
MRP is executed based on the material.
I want to execute MRP based on the MRP controller.
Now on MD01 there is a frame called as 'User Exit select material for planning'
Now here we select the user exit from the user exit key field.
There is also a user exit parameter field in this I want to enter MRP controller and based on this MRP controller the MRP should run.
i e only those material based on a particular MRP controller should execute.
How do we implement this logic in the enhancement M61X0001.
Regards,
Ranjith N
12-31-2008 5:56 AM
Hi Nambiar,
You can check the following very helpful link:
http://help.sap.com/saphelp_erp2005/helpdata/en/62/32b8371a2c9912e10000009b38f889/frameset.htm
Also, you can check the following T-Codes:
MD46 Eval. MRP lists of MRP controller
MD90 Maintain Number Range for MRP
MDBT MRP Run In Batch
MDDISPONENT MRP Controller Workflow
MDLD Print MRP List
MDM4 Mail to MRP Controller
MDM5 Workflow: Mail to MRP Controller
And just have a look at the following thread:
Hope it Helps.
02-05-2009 8:56 AM