cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection Lot

Former Member
0 Kudos

hi,

In QA32 status of inspection lot is CRTD CHCR SPRQ CTCM (inspection type 01)

here Inspection plan was not ready for that material.

so I created one inspection plan and tried to assign it in the change mode of that inspection lot

but it is not getting assigned; I don't understand what may be the reason for non assignment?

because before this I have done such assignments lot of times.

please help

Thanks

vinay

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Vinay,

Check below listed matters.

- Valid from date for inspection plan must be later then then Inspection lot date. i.e. Check the inspection lot date, it must be prior then inspection plan's valid from date.

- The Lot size range you have entered to the Inspection plan must cover the Inspection lot size.

- Material must be assigned to the inspection plan, with proper valid from date.

I think you must have stuck in the Valid from date of inspection plan. To cross check the same. Check it this way.

- QP03--> enter the required details like Materials/Plant or Group / Plant.

- In the header screen, check what date is there for 'Valid from Date'. This date must be later then inspection lot creation date.

- If it's not, then go to QA02. Enter your lot number. and change the 'Key Date' for the inspection lot according to the inspection plan valid from date.

Regards,

Shyamal

Former Member
0 Kudos

excellent shyamal

your following suggestion worked

Go to QA02. Enter your lot number. and change the 'Key Date' for the inspection lot according to the inspection plan valid from date.

thanks a lot

vinay

Edited by: vinay joshi on Dec 27, 2008 12:59 PM

Answers (0)