Vendor return material to quality inspection.

Hi,

I have send Raw materials to vendor for processing. Here we received the final product from vendor

and some Raw materials are left with the vendor.

I want to take back the balance Raw materials from vendor and the balance material, when I take back,

it should go to quality inspection.

What movement i have to use .

Rgs

Vijay.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 11:26 AM

    Hi,

    u can receive back the material by 542 movement but u dont have the stock type o post it to quality inspection.

    u can post the same only after physical varification

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 11:28 AM

    Hi

    Try 542 mov Type and change stock type quality

    vIVEK

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 11:30 AM

    Hi

    Are you using subcontracting process?

    Raju

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 11:34 AM

    Hi

    Inform your QM Consultant to add 542 movement in quality inspection parameter.... he will be able to do it the similar way how he would have done for movt type 101....he just needs to add 542 in the list...

    Award if u find it useful

    Regds

    santosh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 11:38 AM

    Hi

    Use tcode MIGO with 101 movement type and

    Item detail - "where" tab - take "Quality inspection"

    Raju

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.