Bill of material - Production version

In bill of material what is the use of production version? Please explain me....

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    Posted on Dec 23, 2008 at 06:58 AM

    Hi

    Production version is the different possible combinations of input material and output material.

    Example:

    A output material can be produced from 2 different input material.

    so we call

    Production Version 1

    Output material A (BOM version 1)

    Input material B

    Production Version 2

    Output material A (BOM version 2)

    Input material C

    This will exist in SAP as 2 different versions of BOM.

    Reg

    Raja

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 06:55 AM

    Hi,

    Suppose you have 2/3 production lines and 2/3 alternative BOMs to produce one FG.

    How system will come to know which BOM and Routing to be used. This is done thru Prod.Version.

    In production version we maintain the combination of BOM and routing.

    Also it can be designed with lot size or validity period.

    Go to MM02--->MRP4 / Work scheduling view -


    > Prod.Version.

    Enter the validity period and lot size.

    After entering the reqd. routing no. and BOM alternative , carry a check.

    After getting the Green signals ,Continue.

    Thus you have saved the prod. version.

    Mass processing TCode- C223

    Regards,

    Deepak.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 23, 2008 at 06:58 AM

    Hello,

    In bill of material what is the use of production version? >>> in cs03 where you can see Production version ....

    Check C223

    Regards,

    Shailesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 07:33 AM

    Hi Venkatesh,

    Porduct version is different combination of the BOM required to produce the product.

    for Example:

    In subcontracting,

    Vendor1 : needs items (Rawmaterial) X, Y & Z to produce semifinshed product A

    Vendor2 : needs items (Rawmaterial) X & Y to produce semifinshed product A .. since availabality of the Item Z is cheper.... and service charge to produce Product A is equal or less than Vendor 1.

    In this case if u use product version. When you create the subcotacting PO... for Vendor1, the componet porvided to vendor will show as X ,Y & Z.

    subcotacting PO for Vendor 2 : the componet porvided to vendor will show as X &Y

    Hope this will clear your doubt.

    Thanks

    Anand

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.