Skip to Content
author's profile photo Former Member
Former Member

quality stock when the time of goodsissue to production

hello,

any body pls help me. i have getting a problem when the time of goods issue to production.

actully my client requirement is if the material is issued to production if the stock should be quality stock. if it was approved then only it should be used for production.

for this i have taken inspection type 02

but when i have made the issue its creating inspection lot. but stock is diectly posting to production. may i know what is the config to put the stock into quality stock.

other wise is ther any possibility to make the config like if the system should not allow production order confirmation of operetion till the inspection lot should be approved.

thanks & regards

bhakta

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 10:31 AM

    Hi

    Alternatively you can do config for Order Type confirmation parameters ( Unless QM operation is confirm / result recording is not done, PP Confirmation NOT possible)

    Trust this will help w/o using any user exit

    Regards

    GIRISH

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 07:16 AM

    Hi bhakta,

    you are looking for scenario QM in Production,

    Here after confirmation of production order inspection lot will be created and goods are posted to quality stock, Then you have to process inspection lot, give usage decesion and based on usage decesion you can post the stock in unrestricted use.

    This is better explained in following document

    help.sap.com/printdocu/core/Print46c/en/data/pdf/QMPROD/QMPROD.pdf

    study this and revert back in case of difficulty

    Suhas

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 23, 2008 at 09:35 AM

    Hello,

    Inspection type 02 is not stock specific. so it will not hold material in quality. Lot will be created but stock posting will not be available.

    To hold the confirmation for UD of the 02 inspection lot you may have to go for a development.

    Use this USer exit CONFPP05. Pass the order number in QALS table you will get the Inspection lot number. pass the inspection lot number to QAVE to check whether UD code is given. IF UD is not given give error in operation confirmation

    Hope this helps

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.