on 12-22-2008 5:35 PM
how can we define the Lot size and validity period for a BOM means we want to define that 1 to 100 qty are to be produced with alternate 1 and 101 to 1000 for alternate 2. How the same can be defined in the master BOM.
There is one component in the BOM and there is a alternate material is also, Users want to define that while issuing the material , system allow to issue only say qty " 50" and then alternate material for next lot.
Is there any possibility to define the BOM as per the above requirement.
thanks
harish
we found solution for defining the alternative material in BOM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Harish,
if u have alternative BOM's, then creat production versions
1) creat BOM with two alternatives (say alt 1 1to 100 & alt 2 101 to 200)
2) creat multiple Routings with two group counters
3) creat production version in MM02 in MRP 4 view or work scheduling view
4) in BOM slection in MRP 4 view maitain the prameter as 3 or 4
Then MRP takes care of lot sizes difined in PV & BOM and creat procurment proposals
Regards
kumar
Edited by: kumar kumar on Aug 3, 2009 8:02 AM
what you asked in 2nd part is not possible without some exit (dobutfl about that also)
but first part is, when u create an altername BOM, there is field for lot size, so u can maintain that,
so depending upon the lot size system will determine the BOM
Regards,
Pravin Mukkawar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.