Configuring Central User Administration

Hi,

I am in the process of configuring CUA for my Landscape

I have 2 system ABC and XYZ

ABC will be the Central System and XYZ will be the Child system

I have done the steps untill now

1. Created SM59 connection in both the systems ABC and XYZ

2. Create a logical System with name XYZCLNT100 in System ABC and also created a Logical system with name ABCCLNT100 in System XYZ

Please let me know whether this is correct

As a next step i understand that i have to assign the logical system XYZCLNT100 in System ABC to a new Client in System ABC.

Please let me know whether my understanding is correct

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Dec 22, 2008 at 02:24 PM
    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 22, 2008 at 04:30 PM

    I understood that the SM59 connection and the logical system name should be same and the SAP automatically recognises the same