on 12-22-2008 2:14 PM
Hi,
I am in the process of configuring CUA for my Landscape
I have 2 system ABC and XYZ
ABC will be the Central System and XYZ will be the Child system
I have done the steps untill now
1. Created SM59 connection in both the systems ABC and XYZ
2. Create a logical System with name XYZCLNT100 in System ABC and also created a Logical system with name ABCCLNT100 in System XYZ
Please let me know whether this is correct
As a next step i understand that i have to assign the logical system XYZCLNT100 in System ABC to a new Client in System ABC.
Please let me know whether my understanding is correct
I understood that the SM59 connection and the logical system name should be same and the SAP automatically recognises the same
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Balaji,
Go through his link.
[http://help.sap.com/saphelp_bw21c/helpdata/en/cd/16b0cb100711d295750000e82de14a/content.htm]
Thanks,
Sudheer.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.