Skip to Content
author's profile photo Former Member
Former Member

Time management

HI,

I have created absences quotas in 2006 but it is n getting reflected in 2013 in quality n in ides it is getting reflected, but when i am trying to increase Privelge leave by 5 days in ideas the system is not updating the same in 2006...can anybody guide me on this as how to do it....n how it works

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 22, 2008 at 09:53 AM

    the land scape shd be DEV and Quality right how come IDES and Quality

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.