Error occured in the phase MOVE NAMETABS while updating patch.

Hi Gurus

When i implementing a SP15 to SP16 in a queue, i got the Dump.

Please help me in this issue.

The import was stopped, since an error occurred during the phase

IMPORT_PROPER, which the Support Package Manager is unable to resolve

without your input.

After you have corrected the cause of the error, continue with the

import by choosing Support Package -> Import queue from the initial

screen of the Support Package Manager.

The following details help you to analyze the problem:

- Error in phase: IMPORT_PROPER

- Reason for error: TP_STEP_FAILURE

- Return code: 0008

- Error message: OCS Package ALL, tp step "6", return code 0008

Notes on phase IMPORT_PROPER

In this phase repository objects and table entries are imported. This

phase can terminate due to the following reasons:

o TP_INTERFACE_FAILURE: The tp interface could not be called.

o TP_FAILURE: The program tp could not be executed. For more

information on this, see the SLOG or ALOG log file.

o TP_STEP_FAILURE: A tp step could not be executed. To find the cause

of the error, see the appropriate log, such as the import log.

If the cancelation message contains a tp step 6, N or S, the step in

question is independent of the transport request. You can find these

logs under the node Import steps not specific to transport request

in the log overview.

Alternatively, you can find these logs in the following files in the

log directory of your transport directory (usually:

/usr/sap/trans/log):

- tp Step 6: P<YY><MM><DD>.<SID>

- tp Step N: N<YY><MM><DD>.<SID>

- tp Step S: DS<YY><MM><DD>.<SID>

You can display these files using the report RSPUTPRT or by calling

transaction AL11.

A prerequisite of the Support Package Manager is that the Change and

Transport System (CTS) is configured correctly. For more detailed

information, read the online documentation available from Help -> SAP

Library -> mySAP Technology Components -> SAP Web Application Server ->

Change and Transport System .

A list of the most important SAP Notes for Online Correction Support

(OCS) is available in SAP Note 97620, which is updated regularly.

Regards,

Ganesh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Dec 22, 2008 at 09:12 AM

    You need to check the import logs and post the error so we can help you.

    Most likely the error will be listed on the known issues Note attached to the SP.

    Regards

    Juan

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 22, 2008 at 09:14 AM

    Did you check SLOG or ALOG log file for detailed error?

    Check the import logs and tp system log and post the error you get over there. Also, mention exactly which patch you were applying.

    For import logs, SPAM >> goto >> import logs >> queue

    TP system log, SPAM >> goto >> import logs >> TP system log

    Regards,

    Jazz