In some of the production orders for a given material cost analysis, target qty of all the components are showing as zero and target cost also zero.

but for for the same material in some orders qty and values are displaying

What could be the issue.

Regards

Karthik

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 11:39 AM

    Hi, Try variance calculation without settlement for those orders where there is no target costs. At the time of Variance Calculation, the system has to bring in the target costs for compansion. There is no other go. Hence, you need not worry about it and the system will take care of it. Trust this helps much! Cheers!

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.